Global Tech Leader LEAP
Double Decker / Custom Build

Global Tech Leader
LEAP

700 sqmRiyadh, Saudi Arabia

The Project

A 700 sqm double-decker stand that gave our client a commanding two-level presence at LEAP — Saudi Arabia's largest tech event. The build housed live product demos, executive meeting suites, and a keynote theatre, turning a floor plot into a destination.

Project Specs

Client

Global Tech Leader

Event

LEAP

Location

Riyadh, Saudi Arabia

Size

700 sqm

Type
Double DeckerCustom Build
The Challenge

What We Were Up Against

01

Delivering a fully compliant two-storey structure within a 10-day venue access window, while meeting Saudi Civil Defence load and fire safety requirements for upper-deck occupancy.

02

The upper deck needed to support meeting rooms, a hospitality lounge, and continuous foot traffic without any structural compromise.

03

Coordinating AV, lighting, and HVAC across two levels required a power distribution plan that could handle peak demo loads without interruption.

Our Solution

How We Made It Happen

01

The superstructure was pre-fabricated in our Dubai workshop and shipped flat-pack to Riyadh, cutting on-site assembly time in half.

02

A 63A three-phase power distribution system isolated AV, lighting, and HVAC on dedicated circuits to prevent brownouts during peak demo hours.

03

The result: a structure that performed like a permanent installation but was built, used, and dismantled in under three weeks.

Project Photos

Engineering Highlights

Double-Decker Superstructure

Steel-framed two-storey build engineered for 350 kg/sqm upper-deck loading — strong enough for meeting rooms, a hospitality lounge, and full foot traffic.

320 sqm Printed Graphics

Modular tension-fabric lightboxes and direct-print panels on flame-retardant substrates, designed for rapid swap-out between event phases.

63A Power Distribution

Three-phase electrical system with isolated circuits for AV, lighting, and climate control — zero brownouts across four days of continuous demos.

The Outcome

  • Installation completed one day ahead of schedule with a 35-person crew
  • Zero safety incidents across build, show, and dismantle phases
  • Over 8,000 visitor interactions logged across the 4-day event
  • Client signed the next edition's contract before the show closed
0 sqm

Stand Footprint

0

Installation Crew

0 days

Build Time

Ready to Build Something Like This?

Tell us about your next exhibition and we'll show you what's possible.

Start Your Project
Chat with us